Trans-Asian Railway

The Trans-Asian Railway (TAR) is a project to create an integrated freight railway network across Europe and Asia. The TAR is a project of the United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP).


Overview

The project was initiated in the 1950s, with the objective of providing a continuous 8,750 miles (14,080 km) rail link between Singapore and Istanbul, Turkey, with possible further connections to Europe and Africa. At the time shipping and air travel were not as well developed, and the project promised to significantly reduce shipping times and costs between Europe and Asia. Progress in developing the TAR was hindered by political and economic obstacles throughout the 1960s, 1970s and early 1980s. By the 1990s, the end of the Cold War and normalisation of relations between some countries improved the prospects for creating a rail network across the Asian continent.


The TAR was seen as a way to accommodate the huge increases in international trade between Eurasian nations and facilitate the increased movements of goods between countries. It was also seen as a way to improve the economies and accessibility of landlocked countries like Laos, Afghanistan, Mongolia, and the Central Asian republics. Much of the railway network already exists as part of the Eurasian Land Bridge, although some significant gaps remain. A big challenge is the differences in rail gauge across Eurasia. Four different major rail gauges (which measures the distance between rails) exist across the continent: most of Europe, as well as Turkey, Iran, China, and the Koreas use the 1,435 mm (4 ft 8 1⁄2 in) gauge, known as Standard gauge; Russia, and the former Soviet republics use a 1,520 mm (4 ft 11 27⁄32 in) gauge; Finland uses a 1,524 mm (5 ft) gauge; most of the railways in India, Pakistan, Bangladesh and Sri Lanka use the 1,676 mm (5 ft 6 in) gauge, known as Indian gauge; and most of Southeast Asia has 1,000 mm (3 ft 3 3⁄8 in) metre gauge. For the most part the TAR would not change national gauges; mechanized facilities would be built to move shipping containers from train to train at the breaks of gauge.


By 2001, four corridors had been studied as part of the plan:


The Northern Corridor will link Europe and the Pacific, via Germany, Poland, Belarus, Russia, Kazakhstan, Mongolia, China, and the Koreas, with breaks of gauge at the Polish-Belarusian border (1,435 mm (4 ft 8 1⁄2 in) to 1,520 mm (4 ft 11 27⁄32 in)), the Kazakhstan-Chinese border and the Mongolian-Chinese border (both 1,520 mm to 1,435 mm). The 5,750 miles (9,250 km) Trans-Siberian Railway covers much of this route and currently carries large amounts of freight from East-Asia to Moscow and on to the rest of Europe. Due to political problems with North Korea, freight from South Korea must currently be shipped by sea to the port of Vladivostok to access the route.

The Southern Corridor will go from Europe to Southeast Asia, connecting Turkey, Iran, Pakistan, India, Bangladesh, Myanmar, and Thailand, with links to China's Yunnan Province and, via Malaysia, to Singapore. Gaps exist between India and Myanmar, between Myanmar and Thailand, between Thailand and Cambodia, between Cambodia and Vietnam and between Thailand and Yunnan. The section in eastern Iran between Bam and Zahedan has been completed. Breaks of gauge occur, or will occur, at the Iran-Pakistan border (1,435 mm (4 ft 8 1⁄2 in) to 1,676 mm (5 ft 6 in)), the India-Myanmar border (1,676 mm to 1,000 mm (3 ft 3 3⁄8 in)), and to China (1,000 mm to 1,435 mm).

A Southeast Asian network; this primarily consists of the Kunming–Singapore Railway.

The North-South Corridor will link Northern Europe to the Persian Gulf. The main route starts in Helsinki, Finland, and continues through Russia to the Caspian Sea, where it splits into three routes: a western route through Azerbaijan, Armenia, and western Iran; a central route across the Caspian Sea to Iran via ferry; and an eastern route through Kazakhstan, Uzbekistan and Turkmenistan to eastern Iran. The routes converge in the Iranian capital of Tehran and continue to the Iranian port of Bandar Abbas.

Agreement[edit]

The Trans-Asian Railway Network Agreement is an agreement signed on 10 November 2006, by seventeen Asian nations as part of a United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP) effort to build a transcontinental railway network between Europe and Pacific ports in China.[1] The plan has sometimes been called the "Iron Silk Road" in reference to the historical Silk Road trade routes.[2] UNESCAP's Transport & Tourism Division began work on the initiative in 1992 when it launched the Asian Land Transport Infrastructure Development project.[3]

The agreement formally came into force on 11 June 2009.[4]

The network[edit]

The Trans-Asian Railway system will consist of four main railway routes. The existing Trans-Siberian railway, which connects Moscow to Vladivostok, will be used for a portion of the network in Russia.[5] Another corridor to be included will connect China to Korea, Mongolia, Russia and Kazakhstan.[6] In 2003, the president of Kazakhstan proposed building a standard gauge link from Dostyk (on the Chinese border) to Gorgan in Iran; it has not yet been built.[7]

Standards[edit]

Complicating the plan is the differences in rail gauges currently in use across the continent. While China, Iran and Turkey use 1,435 mm (4 ft 8 12 in)standard gauge tracks, Russia's tracks are currently gauged at 1,520 mm (4 ft 11 2732 in), India's and Pakistan's tracks are 1,676 mm (5 ft 6 in) gauge, the tracks covering an area from Bangladesh east to Vietnam and south to the tip of the Malay Peninsula are 1,000 mm (3 ft 3 38 in) gauge with some dual gauge track near the China-Vietnam border and within Bangladesh, and tracks in Indonesia and Japan are 1,067 mm (3 ft 6 in) gauge.[3] This leads to time consuming interchanges to handle the break of gauge at main connecting points in the network. The new and existing track from Akhaura near India-Bangladesh border to India-Myanmar border is being converted to 1,676 mm (5 ft 6 in) under Project Unigauge of Indian railways.


Other standards to consider are:

  • railway electrification - 25 kV AC the world standard for new long distance and heavy duty construction since the 1950s.

  • Couplings - Buffers & Chains, Alliance, or SA2. Some dual fitment or transition couplings are possible.

  • Brakes - air, with or without Electronically controlled pneumatic brakes (ECP).

  • Loading gauge and Structure gauge - able to take tallest possible shipping container. Possible double stacking.

  • Signalling systems - where signals are electronic, not physically visible, and must be 'read' by equipment in the locomotives, or where the train must interact in different ways with the infrastructure

  • Electromagnetic interference - where radio waves (noise) from electric motors can interact with different signalling systems

  • Rules and regulations.

  • Language, including say Seaspeak.

  • Break of gauge devices, such as dual gauge or Train on Train piggybacking.

Participating nations[edit]

Transportation and railway ministers from forty one nations participated in the week-long conference[8] held in Busan, South Korea, where the agreement was formulated. The proposed 80,900-km railway network will originate from the Pacific seaboard of Asia and end on the doorsteps of Europe. The agreement's cosigners included:[1]

  • Armenia Armenia

  • Azerbaijan Azerbaijan

  • Cambodia Cambodia

  • China China

  • India India

  • Indonesia Indonesia

  • Iran Iran

  • Kazakhstan Kazakhstan

  • Laos Laos

  • Mongolia Mongolia

  • Nepal Nepal

  • Pakistan Pakistan

  • Bangladesh Bangladesh

  • South Korea South Korea

  • Russia Russia

  • Sri Lanka Sri Lanka

  • Tajikistan Tajikistan

  • Thailand Thailand

  • Turkey Turkey

  • Uzbekistan Uzbekistan

  • Vietnam Vietnam

The 24 countries that did not sign the agreement at the conference had until 31 December 2007, to join and ratify the agreement.[9]

On 5 May 2007, officials in Bangladesh announced that the nation will sign on to the agreement at an upcoming meeting in New York City. The plan for the network includes three lines between India and Myanmar that traverse Bangladesh.[10] India made a similar announcement on 17 May 2007. As part of the agreement, Indiawill build and rehabilitate rail links with neighboring Myanmar in projects that are estimated to cost more than 29.41 billion (US$730 million).[11]

Bangladesh finally signed the agreement on 10 November 2007.[12]

Progress[edit]

The Northern Corridor was working already in the 1960s, although at first only for Soviet Union-China trade. The Southern corridor has been opened up after 2000. Successes so far include:

  • A train ferry across Lake Van, from 1970s allowing rail services between Turkey and Iran.

  • link from China to Kazakhstan (Turkestan–Siberia Railway and Lanxin railway, connected in 1990).

  • link from Iran to Central Asia (Trans-Caspian railway; branch Tejen - Sarakhs - Mashhad, completed in 1996).

  • link from Iran to Herat in Afghanistan completed 2013.

  • direct freight service between Germany and China through Russia is operating from the first decade of the 2000s (reloading of container at break-of-gauge).

  • Bosphorus tunnel connecting European Turkey and Asian Turkey, opened 2013. Before this, there was a freight train ferry there.

  • Iran-Pakistan: A Bam - Zahedan link, with a break-of-gauge at Zahedan (Pakistan railway use Indian gauge 1,676 mm (5 ft 6 in) & Iran railway use Standard gauge 1,435 mm (4 ft 8 12 in)). In August 2009 a goods train carrying containers traveled from Islamabad, Pakistan to Istanbul, Turkey; by April 2011, trains were running regularly.[13]

  • second link from China to Kazakhstan (line Zhetigen - Khorgos, completed in December 2011).

  • agreement in 2014 between Iran, Azerbaijan and Russia on completing the north-south corridor.[14] The missing link is Astara–Rasht, 167 km.

Technically it is possible to introduce a train service between Britain and Dhaka (Bangladesh) (the eastern limit of the 1676mm broad gauge railway), with a break of gauge at Zahedan on the Iran - Pakistan border.

Yunnan Attractions | Yunnan Festivals | Yunnan Hotels | Yunnan Pictures | Travel News | Yunnan Birding Tours | Yunnan Flowers Tours | Yunnan Golf | Maps of Yunnan | Why Yunnan | Feedback | FAQ | West China Tours

TRAVEL NEWSLETTER




You will only receive emails that you permitted upon submission and your email address will never be shared with any third parties without your express permission.

CONTACT US          ↑TOP
sales@mysterioustibet.com
0086-13529022630
Emergency Call:0086-13529022630
Skype: Adventure-China
Wechat/QQ:Adventure-China
Lifang Building-B, Xianggeli Avenue, Gucheng District, Lijiang, Yunnan, China 674100
 
   Wechat
Copyright © 2015-2018 All Rights Reserved. www.YunnanAdventure.com
Follow us on: